Boundary Wall In Mumbai

The first step in constructing a compound wall is defining the boundary. Setout is done to mark the property boundary. After the boundaries are set, earth excavation is done. In most cases, a shallow level earth excavation would suffice. This is because the compound wall as such is not a heavy structure. A boundary wall is a structure that is built to mark and define the limits of a property or an area. It serves several purposes, including providing privacy, security, and separation between different properties or spaces. Boundary walls can be constructed using various materials such as brick, stone, concrete, wood, metal, or a combination of these materials. Key functions of a boundary wall include: Property Demarcation: The primary purpose of a boundary wall is to clearly define the extent of a property, preventing any disputes over land ownership. Privacy: Boundary walls can provide a sense of privacy by creating a barrier between neighboring properties, blocking direct views into the property. Security: A well-constructed boundary wall can act as a deterrent to unauthorized access and intruders, enhancing the security of a property. Noise Reduction: A solid boundary wall can help reduce noise pollution from the surrounding environment, providing a quieter living or working space. Aesthetics: Boundary walls can contribute to the overall aesthetics of a property, adding to its visual appeal. They can be designed to match the architectural style of the property. Wind and Dust Protection: In certain regions, boundary walls can help protect…

0 Comments

Rock Excavation By Chemical Method In Mumbai

TRIMMING QUARRYING SPLITTING Rock Excavation By Chemical MethodSilent - Fast - Economical - ConvenientRock excavation shall be defined as the excavation of all hard, compacted or cemented materials that require blasting or the use of ripping and excavating equipment larger than defined for common excavation. Mix the chemical with the normal water in topper proportion.Fill the Mix chemical in depth of 2.5m c/c 300mm each.After filling of chemical in hole, within 4 hours crack will occur on rock.Break the rock by Rock Breaker Machine and loaded into the dumper by bucket and dispose outside the site premises.Advantages:-There is no vibration at the time of minor cracks developont rock. So, no any type of damage will be occuriong, in nearest standing structure and tunnel.There is no any kind of NOC require in this methodIt is cheap and fastest method compare of diamond cutter methodIts allow to construct concreting work during the rock breaking method.It’s easy to handle manually as well as via transportation.It is noiselessDisadvantages:-There is no any type of disadvantages in this method. Rock excavation by chemical methods involves using chemical agents to break down or weaken the rock, making it easier to remove or extract. This technique is typically employed in situations where traditional mechanical methods, such as drilling and blasting, might not be feasible or safe due to factors like the presence of sensitive structures, noise restrictions, or environmental concerns. Here are a few common chemical methods used for rock excavation: Expansive Grouts: Expansive…

0 Comments

Rock Excavation By Chiselling Method/ Rock Breaker Method In Mumbai

Rock excavation by chiselling method, also known as the rock breaker method, is a technique used to break or excavate rock materials using handheld tools such as chisels, hammers, and rock breakers. This method is commonly employed in construction, mining, and civil engineering projects where rocks need to be removed or broken down into smaller pieces to facilitate further construction activities. Here's a basic overview of the process: Site Preparation: Before starting the chiselling method, the work area needs to be prepared. This might involve clearing the area, ensuring proper safety measures, and setting up any necessary equipment. Tool Selection: Depending on the size and hardness of the rocks, different types of tools might be used. These can include handheld chisels, hammers, pneumatic rock breakers, and hydraulic rock breakers. Pneumatic and hydraulic breakers are more powerful and efficient for larger rock excavation projects. Marking: The outline of the desired excavation or breaking area is marked on the rock surface. This provides a guideline for the workers and helps ensure precision in the excavation process. Chiselling/Breaking: Workers then use the selected tools to start chiselling or breaking the rock. Handheld chisels and hammers are used to chip away at the rock, while pneumatic or hydraulic breakers deliver powerful impacts to fracture and break the rock into smaller pieces. Safety Measures: Safety measures are crucial during this process. Workers should wear appropriate protective gear, including eye protection, ear protection, helmets, and gloves. Adequate ventilation should be ensured in…

0 Comments

Rock Excavation By Diamond Cutter Method In Mumbai

Insert the diamond cutter wire through both the hole. Diamond cutter wire is then fixed in the rail of the wheel. Wheel will move on the track and start cutting of rock for both hole and on the top side. Sprinkle the water on the top of the wire cutting edge of the rock. By drilling of 100m Dia., spacing 3m centre to centre hole having horizontal distance. Through plumbing, process make the hole of 100mm Dia., on top end of the hole so as to co-incides both the centre to centre hole. Insert the diamond cutter wire through both the hole. Diamond cutter wire is then fixed in the rail of the wheel. Wheel will move on the track and start cutting of rock for both hole and on the top side. Sprinkle the water on the top of the wire cutting edge of the rock. This is done to maintain the temperature of rock and diamond cutter wire. Whole piece of rock is then being get cut in the fashion of cake. Cake broken in pieces by rock breaker machine is then loaded in dumper and disposed outside. AdvantagesThere is no any type of vibration through this method.This method does not affect to any type of nearest concrete work.It is not explosive.No any type of permission is required for this method.In basement area, No shore piling, require in this method.DisadvantagesIt is very costly.It is time consuming job as well.It is very lengthy process as…

0 Comments

Road & Infra In Mumbai

Roads make a crucial contribution to economic development and growth and bring important social benefits. They are of vital importance in order to make a nation grow and develop. In addition, providing access to employment, social, health and education services makes a road network crucial in fighting against poverty. It consists of the installation of fixed assets including surface roads and railways and terminals such as bus stops, trucking terminals, railways stations. It looks like you've mentioned "Road & Infra," which could refer to roads and infrastructure. Roads and infrastructure are crucial components of a modern society, supporting transportation, communication, and overall economic development. Here's some information about these topics: 1. Roads: Roads are essential for connecting people, goods, and services. They facilitate the movement of vehicles and pedestrians, enabling efficient transportation within and between communities. Roads can be classified into various types based on their function, location, and capacity: Highways/Freeways: These are major roads designed for high-speed travel between cities or regions. They usually have multiple lanes, controlled access, and limited intersections. Arterial Roads: These roads serve as primary routes within urban areas, connecting various neighborhoods and commercial districts. Collector Roads: These roads gather traffic from local streets and direct it to arterial roads. They often serve residential areas and provide access to local destinations. Local Streets: These roads provide access to individual properties and serve low-volume traffic. 2. Infrastructure: Infrastructure refers to the fundamental physical and organizational structures necessary for the functioning of a…

0 Comments

Drains & STP work In Mumbai

Drains & STP work  is a process of purification of Sewage water and reusing for Gardening, Agricultural and other general Purpose. Treated Sewage water is purified and maintained as per the Pollution control board norms. STP are mandatory in most of the industries, housing colonies, apartments etc. It looks like you're asking about "Drains" and "STP work." Let me break down what each of these terms typically refers to: Drains: In the context of construction and civil engineering, drains are systems designed to manage the flow of liquids (usually water) away from an area to prevent flooding, erosion, or waterlogging. Drains can be found in various settings, such as residential, commercial, and industrial areas, as well as on roads and highways. There are different types of drains, including surface drains (open channels or ditches), sub-surface drains (pipes buried underground), and more specialized systems like French drains and trench drains. STP (Sewage Treatment Plant) Work: An STP, or sewage treatment plant, is a facility designed to treat and process wastewater from residential, commercial, and industrial sources. The purpose of an STP is to remove pollutants, contaminants, and pathogens from the wastewater before releasing it back into the environment or returning it as treated water for reuse. The work associated with STPs involves a range of processes to treat sewage and wastewater. These processes may include: Preliminary Treatment: Removal of large debris and solids through screens and grates. Primary Treatment: Physical separation of solids from the liquid portion…

0 Comments

Retaining Wall In Mumbai

Retaining walls can be made from wood, bricks, natural stones or concrete blocks. For DIYers, it’s best to use concrete retaining wall blocks, which can be interlocking and are heavy enough to stay in place without cement or other adhesive. Interlocking blocks fit together and add extra security to the wall. A retaining wall is a structure designed to hold back or retain soil, rock, or other materials in a sloped or uneven area. It's commonly used in landscaping, construction, and civil engineering to prevent erosion, manage grading, and create usable spaces on terrain that would otherwise be unstable or prone to collapsing. Retaining walls can serve both functional and aesthetic purposes. Functionally, they provide support and stability to prevent soil erosion and maintain the integrity of slopes. Aesthetically, they can be designed to enhance the visual appeal of a property by creating terraced gardens, leveled spaces, or raised flower beds. There are various types of retaining walls, each with its own design and construction methods: Gravity Retaining Wall: Relies on its own weight to resist the pressure of the soil behind it. These walls are often made of concrete or stone and are suitable for shorter heights. Cantilever Retaining Wall: Uses a reinforced concrete base with a stem that extends back into the retained soil. This type of wall can handle taller heights and heavier loads. Counterfort Retaining Wall: Similar to the cantilever wall but features vertical concrete webs (counterforts) on the backside of the…

0 Comments

Shore Piling In Mumbai

Shore piling is a measure to prevent ground Subsidence while excavating for deep foundation of a super structure. Shore piling also termed as shoring, that may be denoted as temporary bracing used to prevent something , Such as a tunnel, trench , soil or wall from collapse.A pile is basically a long cylinder of a strong material such as concrete that is pushed into the ground to act as a steady support for structures built on top of it . Pile foundations are used in the following situations. When there is a layer of weak soil at the surface. This layer cannot support the weight of the building have to by pass this layer and be transferred to the layer of stronger soil or rock that is below the weak layer. When a building has very heavy, concentrated leads, such as in high structures, bridge, or water tank. There are two fundamental types of pile foundations (based on structural behavior).each of which works in its own way. End Bearing piles. Friction piles. Shore Piling Shore piling is a measure to prevent ground Subsidence while excavating for deep foundation of a super structure. Shore piling also termed as shoring, that may be denoted as temporary bracing used to prevent something , Such as a tunnel, trench , soil or wall from collapse. Shore piling, also known as sheet piling, is a construction technique used to provide temporary or permanent support and containment for excavations, embankments, and foundations. It involves…

0 Comments

Land Development In Mumbai

Land Development Land development generally involves buying raw land and developing it for commercial or residential use. A syndication is a structure in which the developer raises money from investors in order to fund the project. Land development can be very complicated, and can take years to complete. Investors should only consider working with highly experienced developers. Land development refers to the process of transforming raw land into a more valuable and usable form by making changes to its physical, economic, and legal characteristics. This process involves various activities aimed at preparing the land for specific purposes, such as residential, commercial, industrial, or recreational use. Land development typically encompasses several stages, including planning, design, regulatory approvals, infrastructure development, construction, and often, marketing and sales. Key components of land development include: Land Planning and Zoning: This involves determining the most appropriate use of the land based on its location, surrounding infrastructure, and market demand. Zoning regulations and land-use plans often dictate what types of developments can be built in specific areas. Feasibility Studies: Before undertaking a development project, developers conduct feasibility studies to assess the economic, environmental, and regulatory factors that might affect the project's viability. Design and Engineering: Developers work with architects, engineers, and other professionals to design the layout, infrastructure, and amenities of the development. This includes roads, utilities, drainage systems, landscaping, and more. Permitting and Approvals: Developers must obtain various permits and approvals from local government authorities before starting construction. This may include zoning…

0 Comments

Rock Excavation By Control Blasting Method In Mumbai

TECHNICAL REPORT & PROPOSED BLAST DESIGNControlled blasting is a technique of blasting, which is used to reduce the amount of over break and to control ground vibrations. The different types of controlled blasting techniques are pre-splitting, smooth blasting, line drilling, perimeter blasting, and cushion blasting.1.00: Blast Monitoring:1.10: Maximum Explosive Charge per Instant Or per detonation has been tabulated:For PPV 4.00 mmps.2.00: Proposed Blast Design:We have limitations as regards to the maximum explosive charge to be used perinstant. So in order to get the optimum production rate with we have to depend uponthe initiations systems to be used and the special Controlled blasting methods to beincorporated to reduce the blast induced ground vibrations.2.10: Initiation systems that can be used:· Instantaneous Electric Detonators.· Electric Millisecond Delay Detonators· Shock Tube System of initiation.2.11: Of the three methods above the Instantaneous Electric Detonators will offerminimum production with large size boulders and maximum vibrations. As a matterof fact this is being presently used as cost wise it is the cheapest.2.12: The Electric Millisecond Delay detonators though slightly expensive, can offerus better production rate smaller size boulders and less vibrations as compared tothe previous one. Electric delays are available in 10 # & each one is numbered as1,2,3…up to 10 no.. There are 25millisecond delays installed. Number 1 delay willdetonate 25 millisecond after no. “0”, no. 2 will detonate 25 millisecond after no. “1” &so on. All the delays will detonate within 250 millisecond. So total explosive charge inall the blast holes…